Chilime Hydropower project (22.1 MW) holds a prestigious history of constructing a project which has its own complete experience in engineering design and management, and site supervision including operation and maintenance of 22.1 MW Chilime hydropower project. It was a long way back when there wasn’t substantial development of hydropower in the nation. Having many hydropower projects under construction, ChesCo has a strong technical team to handle the various project assignment. On top of the glorious history of CHCL, it should also be noted that CHCL has a strong collaboration with the government of Nepal. The statement is justified by the 51% share of NEA in CHCL; and ChesCo, being a subsidiary company with 100% ownership of CHCL, holds a strong assurance from CHCL by both technical and managerial aspects. The other benefits of working with ChesCo are as follows:
Contract Signing between ChesCo and SMEC
Contract Signed between NEA and ChesCo for Geotechnical Soil Investigation of 220 kv Palpa Substation
Contract Agreement between Nepal Electricity Authority and Chilime Engineering and Services Company Limited(ChesCo)